Rough draft was turned in and need more pages.
On Saturday, we had to rip the bathroom floor out because the sink, the toilet, and the washing machine hookups were leaking for a long time. The floor was soaked through all three layers of the subflooring. The pipe was busted at the washing machine hook up from about eighteen inches down the pipe to the bottom of the shut off valve for the cold water side. The floor took us about an hour and a half to rip up because we was using hammers. We went up to the trailer up the road and replace part of a pipe that went from cpvc to metal piping to pvc back to metal piping back to cpvc. The cpvc was about ten inches that needed to be replaced.