4/29/09

I have to get my pictures from my mentor's camera to upload on my website this weekend after i finish up my project.

April 27

I have gathered the money to purchase the final supplies need to complete my project. I will have to go to Lowes Hardware to pick them up around Thursday or Friday. I will meet with my mentor again on Saturday, May 2, 2009.

February 11, 2009

I have seven pages on my senior paper and getting some last resources so I can finish it up.
For the pieces I need it is gonna cost: $7 for the primer, $4 for a 20 pack of 1/2" cpvc ells, $ 3 for the 1 1/2 p-trap. I have some plywood at my my house but it is 3/4", so i have to contact my mentor to see if that would work. I plan to meet him on Saturday if I have all the supplies.
I have finished my framing for the sink, and have installed the hot water line out of copper. I need a cpvc ell 1/2" to finish up the cold water side. I need the primer to finish up the drain pipes.
All i have to finish getting is some primer, 1/2" cpvc ell, 1/2" plywood 3'*31", 1/2" plywood 1'*31", 1 1/2 p-trap plastic.